Installing vinyl fascia trim.
Vinyl fascia installation.
And vinyl fascia install a frieze back plate f channel on the bottom of fascia board and the complete soffit installation fig.
These items are easy to install and easy to replace if needed and will protect exposed wood from water damage for years.
Get at least 3 5 estimates before hiring a vinyl fascia contractor estimates are typically free unless it s a service call for a repair.
Follow steps 3 4 5 above to complete installation.
If the soffit is to turn a corner cut and install j channel to allow 1 4 6 4mm for expansion at each of the adjoining walls and fascia boards.
Install the panel by hooking the bottom of the fascia panel under the f channel and pushing the top into the undersill trim or drip edge showninillus 4.
Prepare for installation of fascia panel by apply ing undersill trim along the top of the fascia board.
Vinyl soffit and fascia has become one of the most often used products for exterior trim.
Determine the preferred method of installing soffit at the fascia board.
Expect the vinyl fascia prices to fluctuate between various companies each and every company have different operation expenses and over head.
Check that the undersides of the eaves are straight and even source.
For gables vinyl fascia installs the same way but you will slip the vinyl strip under the metal roof edge instead of the gutter apron.
This video covers installing the fascia and proper nailing.
The fascia is nailed to the ends of the roof rafters and is used to attach a gutter to the roof.
It has practically replaced aluminum in new construction and home remodeling.
Before you begin installing vinyl soffit and fascia be sure to do the following.
Cut the bottom end of the fascia level with the bottom edge of the roof.
Soffit installations over open eaves 1 install receiving channels f receiver or j channel.
Read the instructions that come with the soffit and fascia.
Vinyl fascia pricing and installation cost checklist.
Install vinyl fascia on gable ends as well as on the horizontal roof edge.
When installing j channel at either wall of fascia board nail every 8 to 12 203mm to 305mm.